task-decomposition

Transform overwhelming development tasks into manageable units. This skill should be used when the user says 'task too big', 'can't estimate', 'overwhelmed by scope', 'where do I start', 'epic needs breakdown', or has dependency problems. Keywords: decomposition, breakdown, estimate, scope, INVEST,

By jwynia · 583 installs

npx skills add jwynia/agent-skills --skill task-decomposition

Source repository · Upstream listing

Task Decomposition Diagnostic Transform overwhelming development tasks into manageable units by respecting cognitive limits, creating clear boundaries, and enabling parallel work. Tasks properly decomposed achieve 3x higher completion rates and 60% fewer defects. When to Use This Skill Use this skill when: A task feels too big to estimate Unsure where to start Blocked by dependencies Task keeps growing (scope creep) Need to break down an epic or feature Do NOT use this skill when: Task is already small and clear Doing implementation work Architecture decisions needed (use system design) Core Principle The goal isn't more tasks—it's the right tasks. Tasks small enough to understand completely, large enough to deliver value, independent enough to avoid blocking. Quick Reference: Cognitive Limits Limit Threshold Implication Working memory 7±2 items Max concepts per task Context switch recovery 23 minutes Minimize task switching Files examined 15 20 max Bound task scope Days before completion drops 2 3 days Keep tasks under this Task Duration Success Rates Duration Completion Rate < 2 hours 95% 2 4 hours 90% 4 8 hours (1 day) 80% 2 3 days 60% 1 week 35% 2 weeks <10% Diagnostic States TD1: Too Big to Understand Symptoms: Estimates range wildly, can't hold all requirements in mind, more than 7 concepts to track Interventions: Apply INVEST criteria: Independent, Negotiable, Valuable, Estimable, Small, Testable Use vertical slicing (each slice is independently deployable) Apply walking skeleton (minimal end to end first) TD2: No Clear Entry Point Symptoms: Multiple valid starting points, paralysis, everything seems connected Interventions: Front load risk: start with highest uncertainty items Tracer bullet: minimal proof of concept Find the walking skeleton: thinnest slice through all layers TD3: Dependency Problems Symptoms: "Blocked on X", diamond dependencies, coordination overhead Interventions: Interface contracts: define API, mock while implementing Feature flags: deploy independently, enable when ready Branch by abstraction: create layer, swap implementations TD4: No Clear Done Criteria Symptoms: "Almost done" forever, no way to verify completion Interventions: Define acceptance criteria (Given/When/Then) Time box to force prioritization Define explicit out of scope items TD5: Scope Creep Symptoms: Task keeps growing, "while we're here" additions Interventions: Freeze scope, spawn new tasks for additions Define minimum viable version Ship smallest version that solves the problem TD6: Need Spike First Symptoms: Estimate variance 4x, new technology, multiple approaches Interventions: Time boxed spike (8 hours max) Deliverables: options, POC, trade offs, revised estimate Spike then implement pattern Decomposition Patterns Vertical Slicing (Preferred for Features) Walking Skeleton (For New Systems) Tracer Bullet (Validate Architecture) Estimation Techniques Complexity Sizing (Fibonacci) Points Meaning 1 Trivial, < 1 hour 2 Simple, 1 2 hours 3 Standard, 2 4 hours 5 Moderate, 4 8 hours 8 Complex, 1 2 days 13 Very complex, 2 3 days 21 Too large, must decompose Three Point Estimation Anti Patterns Big Bang Delivery Building complete system before any delivery. Fix: Vertical slices, incremental value. Technical Tasks Without Value "Set up database," "Create service layer." Fix: Include in feature tasks: "User can view products (includes DB)." Research Forever Unbounded investigation. Fix: Time boxed spikes with deliverables. Perfect Decomposition Over analyzing before starting. Fix: Decompose next 2 weeks. Details for later work emerge. Decomposition Checklist Before starting any task: [ ] Can hold all requirements in working memory? [ ] Duration under 2 3 days? [ ] Clear acceptance criteria exist? [ ] Dependencies identified and broken where possible? [ ] Can be completed independently? [ ] Delivers verifiable value? [ ] Estimate confidence is high? If any "no" → further decomposition needed. Related Skills github agile Track decomposed work as issues system design Understand architectural boundaries requirements analysis Clarify unclear requirements code review Review after implementation