devops-rollout-plan
Generate comprehensive rollout plans with preflight checks, step-by-step deployment, verification signals, rollback procedures, and communication plans for infrastructure and application changes
By github · 9,660 installs
npx skills add github/awesome-copilot --skill devops-rollout-plan
Source repository · Upstream listing
DevOps Rollout Plan Generator
Your goal is to create a comprehensive, production ready rollout plan for infrastructure or application changes.
Input Requirements
Gather these details before generating the plan:
Change Description
What's changing (infrastructure, application, configuration)
Version or state transition (from/to)
Problem solved or feature added
Environment Details
Target environment (dev, staging, production, all)
Infrastructure type (Kubernetes, VMs, serverless, containers)
Affected services and dependencies
Current capacity and scale
Constraints & Requirements
Acceptable downtime window
Change window restrictions
Approval requirements
Regulatory or compliance considerations
Risk Assessment
Blast radius of change
Data migrations or schema changes
Rollback complexity and safety
Known risks
Output Format
Generate a structured rollout plan with these sections:
1. Executive Summary
What, why, when, duration
Risk level and rollback time
Affected systems and user impact
Expected downtime
2. Prerequisites & Approvals
Required approvals (technical lead, security, compliance, business)
Required resources (capacity, backups, monitoring, rollback automation)
Pre deployment backups
3. Preflight Checks
Infrastructure health validation
Application health baseline
Dependency availability
Monitoring baseline metrics
Go/no go decision checklist
4. Step by Step Rollout Procedure
Phases : Pre deployment, deployment, progressive verification
Specific commands for each step
Validation after each step
Duration estimates
5. Verification Signals
Immediate (0 2 min): Deployment success, pods/containers started, health checks passing
Short term (2 5 min): Application responding, error rates acceptable, latency normal
Medium term (5 15 min): Sustained metrics, stable connections, integrations working
Long term (15+ min): No degradation, capacity healthy, business metrics normal
6. Rollback Procedure
Decision Criteria : When to initiate rollback
Rollback Steps : Automated, infrastructure revert, or full restore
Post Rollback Verification : Confirm system health restored
Communication : Stakeholder notification
7. Communication Plan
Pre deployment (T 24h): Schedule and impact notice
Deployment start: Commencement notice
Progress updates: Status every X minutes
Completion: Success confirmation
Rollback (if needed): Issue notification
Stakeholder Matrix : Who to notify, when, via what method, with what content
8. Post Deployment Tasks
Immediate (1h): Verify criteria met, review logs
Short term (24h): Monitor metrics, review errors
Medium term (1 week): Post deployment review, lessons learned
9. Contingency Plans
Scenarios: Partial failure, performance degradation, data inconsistency, dependency failure
For each: Symptoms, response, timeline
10. Contact Information
Primary and secondary on call
Escalation path
Emergency contacts (infrastructure, security, database, networking)
Plan Customization
Adapt based on:
Infrastructure Type : Kubernetes, VMs, serverless, databases
Risk Level : Low (simplified), medium (standard), high (additional gates)
Change Type : Code deployment, infrastructure, configuration, data migration
Environment : Production (full plan), staging (simplified), development (minimal)
Remember
Always have a tested rollback plan
Communicate early and often
Monitor metrics, not just logs
Document everything
Learn from each deployment
Never deploy on Friday afternoon (unless critical)
Never skip verification steps
Never assume "it should work"