Create detailed, execution-ready implementation plans for complex or high-risk changes without coding. Use for ExecPlan-style work, multi-hour changes, significant refactors, migrations, resumable phase checklists, and work that should be handed off to execute-plan with clear validation.
By buiducnhat · 511 installs
npx skills add buiducnhat/cobrew --skill write-plan
Source repository · Upstream listing
Write Plan
Overview
Produce a complete, self contained implementation plan that can be executed by execute plan with minimal ambiguity, even after /clear or by another agent.
This skill is for planning only:
Do not implement code
Do not modify production files (except plan artifacts)
Workflow
Step 1: Contextualize
Load only the project context relevant to the requested change:
If docs/SUMMARY.md exists, read it first.
Load only task relevant detail docs.
Prioritize Code Standard docs for implementation conventions.
If docs conflict with code or user intent, use the available input/question tool before broad changes.
Then inspect only the code areas relevant to the requested change.
Capture:
User visible purpose and expected outcome
Existing patterns to follow
Constraints and dependencies
Files, modules, commands, and docs that orient the executor
Risks, assumptions, and unknowns
Step 2: Initialize Plan Artifacts
1. Create: docs/.plans/YYMMDD HHmm <plan slug /
2. Create:
SUMMARY.md
one phase file per implementation phase with naming convention phase XX <name .md
3. Add research/ only if needed.
Rules:
Use timestamp commands from the shared General Principles for folder and document timestamps.
Step 3: Clarify Requirements
Ask clarifying questions to resolve any ambiguity in the request. Focus on:
Scope and boundaries
Success criteria
Constraints and non goals
Priorities and trade offs
Rules:
If requirements are already clear or come from the brainstorm context, no need the confirmation step.
Use input/question tool for gathering answers, context.
State assumptions explicitly in SUMMARY.md . If multiple interpretations of the request exist, list them and ask — never pick silently.
Step 4: Define Strategy and Phases
Design a phased strategy that is safe and verifiable.
Each phase should have:
A clear objective
The complexity and risk level appropriate to the phase with values: S , M , L , XL
Ordered tasks
Verification commands
Observable acceptance criteria and exit criteria
Granularity rule:
Tasks should be small, concrete each.
Prefer phases that can be resumed safely. Document idempotency, recovery notes, or rollback constraints for risky work.
Step 5: Research (Only if Needed)
Research is optional and should be proportional to uncertainty.
Preferred order:
1. Existing project docs and code
2. Existing skills and local references
3. External references (only if available in the current environment)
If external research capability is unavailable, proceed with local evidence and explicitly list assumptions and open questions.
Document findings in:
docs/.plans/YYMMDD HHmm <plan slug /research/<topic .md
Step 6: Write Plan artifacts
SUMMARY.md format
Follow the template inside references/summary template.md
phase XX <name .md format
Follow the template inside references/phase template.md
Use skill visualize to visualize the plan, otherwise, skip visualization if non visualize is present.
Step 7: Review and Refine
Before presenting the plan, verify:
Paths are exact and consistent
Phase order is logical
Tasks are actionable (no vague steps)
Verification is defined for each phase
Acceptance criteria are observable
Risks/assumptions are explicit
Plan is executable without hidden context from the current chat
Then present for user review.
If multiple viable approaches exist, present options and ask for one of: (use input/question tool for selection)
Confirm : approve current plan for execution
Validate : refine via additional clarifying questions
Step 8: Handoff
End with:
If visualization was created, also include:
Rules
Never automatically implement or execute the code change in the same session. Optional plan visualization is allowed only after user selection and only for the plan artifacts.
Prefer explicit file paths and concrete commands
Align with project standards and existing architecture
Keep plans self contained, deterministic, and resumable. A fresh agent should be able to continue from the plan folder alone.
Plan the minimum viable change: No speculative phases, no "just in case" abstractions, no flexibility that wasn't requested. If a plan can be 3 phases instead of 6, make it 3. Every task should trace directly to a stated requirement.
Write artifacts in language same with the current session.